  • DAIRY PLANT-WIDE CONTROL SYSTEM UPGRADE IN LESS THAN 3 DAYS

    PostedWednesday, June 17,2020 at 2:08 PM

    The objective of this project was to eliminate the risk of production going down as a result of a failed obsolete component of the control system coupled with no system backup and no means of technical support. This would be accomplished by converting six (6) remote racks and 800+ I/O points to a new control platform, integrating a new production server, upgrading network infrastructure, and updating control system documentation.