DAIRY PLANT-WIDE CONTROL SYSTEM UPGRADE IN LESS THAN 3 DAYS
DAIRY PLANT-WIDE CONTROL SYSTEM UPGRADE IN LESS THAN 3 DAYS

PostedWednesday, June 17, 2020 at 2:08 PM

Updated06/17/2020

The objective of this project was to eliminate the risk of production going down as a result of a failed obsolete component of the control system coupled with no system backup and no means of technical support. This would be accomplished by converting six (6) remote racks and 800+ I/O points to a new control platform, integrating a new production server, upgrading network infrastructure, and updating control system documentation.

Read the full case study here.

The objective of this project was to eliminate the risk of production going down as a result of a failed obsolete component of the control system coupled with no system backup and no means of technical support. This would be accomplished by converting six (6) remote racks and 800+ I/O points to a new control platform, integrating a new production server, upgrading network infrastructure, and updating control system documentation.

Read the full case study here.

Read More
Filed Under
Industries
  • Food, beverage & consumer goods
    • Dairy
Specialties
  • Services
    • Validation
Products
  • General Automation
    • Distributed Control System (DCS)
    • PLCs, PACs
Posted by