A 80MW solar farm in North Carolina needed controls and insight on a site spanning 800 acres. The primary concern was ensuring communications reliability over long distances, and creating a redundant network to ensure continued reporting...without breaking the bank.
CHALLENGE: In 2015/2016, Duke Energy Renewables wanted to outfit their new 80MW solar farm in Conetoe, North Carolina with controls and insight into each critical operational piece of equipment. They wanted to see the performance of each solar array, the positional data of the panels tracking system, and the key irradiance data from the site’s four weather stations.
These data points included wind speed and direction, ambient temperature, POA, HOA and BOM sensors data, tracking positions and set points, voltage and KW production. All of these data points are used to access the performance and health of the systems performance at any given point in time, and used to dispatch repair teams accordingly.
Because the site spans over 800 acres, their primary concern was ensuring communication reliability over long distances and the creation of a redundant network to ensure continued reporting should anyone device fail.
Another prominent concern was the cost and downtime of traditional hardwired communications. Not only would a wired infrastructure in a large solar field take months for trenches to be dug, fiber cables to be buried, fiber to be converted into copper, and infrastructure to be wired, the cost of labor and materials would be astronomical. In the long term, troubleshooting, future repair, and accident scenarios (such as accidentally cutting a hidden cable) can result in days to weeks of production downtime.
SOLUTION: At less than 10% of the cost of a wired infrastructure and with comparable reliability for this particular application, a wireless communications infrastructure was a must-have for the Conetoe solar site. Duke Renewables worked through their contractor, SunEnergy1, to contract...
SOLUTION: At less than 10% of the cost of a wired infrastructure and with comparable reliability for this particular application, a wireless communications infrastructure was a must-have for the Conetoe solar site. Duke Renewables worked through their contractor, SunEnergy1, to contract with Affinity Energy in early 2016 to design, provide, and install a wireless communications infrastructure that reported back to a web-based supervisory control and data acquisition (SCADA) system.
After conducting a wireless site survey to ensure strong wireless reliability, Affinity Energy solar experts determined 900MH radios would make the most sense for the giant solar farm. Even though 900MH radios are known for providing less bandwidth than industrial 2.4GH, their line of site offers an astounding 20-40-mile radius. In addition, because the data Duke Renewables was interested in receiving was processed, the high bandwidth of 2.4GH wasn’t necessary.
RELATED: Don’t Fear Industrial Wireless Integration in Solar
To ensure a honeycomb of redundancy with multiple connections to multiple radios, Affinity Energy field services set up a wireless mesh network. If a failure happened to occur, it would only affect one radio instead of dropping communications from an entire section of the farm. To reduce complexity to the communications system, Affinity Energy installed 15KW central inverters within the infrastructure.
RESULTS: In just two weeks, Duke Renewables’ communications structure had a fully-integrated wireless backbone. Due to the simplified network, there are less points of failure, which means Duke Renewables has more peace of mind that even if a radio happens to go bad (a rarity), a new radio can be installed in just half an hour.
After the successful completion of inexpensive, quick, and simple wireless integration, Duke Renewables contacted Affinity Energy again and asked them to install wireless redundancies throughout the solar field for extra security.
Contact Affinity Energy for more information on this case study, or other related projects.
ABOUT SUNENERGY1 & DUKE ENERGY RENEWABLES: Duke Renewables and contractor SunEnergy1 built the largest solar farm operating east of the Mississippi, in Conetoe, NC. This vast 800 acre solar farm is comprised of 375,000 solar panels, and was built in just under 10 months.
ABOUT AFFINITY ENERGY: Affinity Energy is a control systems integrator that works with mission critical facilities, distributed generation plants, energy companies, engineering firms, and construction contractors who seek turnkey systems for power management and energy optimization.