Patti Engineering - Tennessee Office Addl Branch
6138 Preservation Dr, Ste 100 Chattanooga TN 37416 United States
Phone 1423-425-9726
Phone 3888-640-3844
  Main Organization  
  • 2110 East Walton Blvd., Ste. A, Auburn Hills, MI
    United States, 48326
    Phone248-364-3200
    Fax248-364-3371
  Main Organization  
  • 2110 East Walton Blvd., Ste. A, Auburn Hills, MI
    United States, 48326
    Phone248-364-3200
    Fax248-364-3371
Latest Updates
  • Patti Engineering, Inc. shared an update
    PostedFriday, November 2,2018 at 11:33 AM
    Not only did our customer get a brand new controls system up and running production in 7 days, but they now have machines that run faster, recover easier, and have less downtime than they have ever had in their 20-year history. http://bit.ly/2SGfXMb
  • Patti Engineering, Inc. shared an update
    PostedTuesday, October 23,2018 at 1:01 PM
    Patti Engineering co-presented with Siemens “How the IIoT Can Deliver a Triple Play for Industry,” and unveiled a hands-on electronic high striker game at the Gartner ITXpo. http://bit.ly/2SamL4B
  • Patti Engineering, Inc. shared an update
    PostedFriday, October 12,2018 at 1:38 PM
    While none of these updates required major equipment overhauls, a few smart solutions have resulted in significantly reduced time loss, more accurate asset tracking, reduced cycle time, and reduced operator hassle. http://bit.ly/2NESIOT
View More
Latest Resources
  • PostedMonday, July 23,2018 at 10:42 AM

    A critical part of executing a successful UHF RFID project is ensuring adequate antenna coverage of the read point. Antenna coverage is best considered during the design phase of a project, when there are many options to ensure proper tag reads. Antenna coverage must be checked during the commissioning phase, which may uncover gaps in antenna coverage. If corrective action is required during commissioning, the RFID application engineer has some options to eliminate the deficiencies. The option selected depends on the specific application and the RFID application engineer’s professional judgment.

    Read More
  • PostedMonday, April 20,2015 at 2:00 PM

    Patti Engineering, a Mitsubishi Authorized Integrator with extensive expertise in Mitsubishi automation technology, worked with Kawasaki Robotics (USA), Inc. to upgrade a robotics underbody sealer system for the Toyota Camry’s paint line at Subaru of Indiana Automotive (SIA) in Lafayette, Indiana. See the case study for details.

    Read More
  • PostedFriday, April 17,2015 at 11:57 AM

    Siemens S5 to S7 Case Study. Knowing the S5s were discontinued years ago, Oetiker’s Production Engineer Jeremy Roberts and his team knew the older equipment with the S5 control system would become cumbersome in terms of cost and maintenance, with downtime potentially compromising production and adversely effecting Oetiker’s ability to service its customers’ needs in a timely fashion. Relying on Patti Engineering’s expertise in Siemens technology and control system upgrades, Oetiker’s team established a plan to upgrade their equipment’s legacy S5 control system to the more advanced and powerful Siemens S7.

    Read More
View More