  • Patti Engineering, Inc. shared an update
    Posted11 days AGO
    In many ways and for many reasons, facilities are being asked to become nimbler and adapt to change more quickly.
    
    http://bit.ly/2R1fQdW
    
    A More Flexible Facility through Digitalization - Patti Engineering
    Upgrade project examples that make digitalization work for your manufacturing facility, for more flexible production, planning, and maintenance.
    bit.ly
  • Patti Engineering, Inc. shared an update
    PostedThursday, October 31,2019 at 12:17 PM
    Not a single bolt was moved as we played around with different configurations to find the most efficient methods.
    
    http://bit.ly/2PClxjM
    
    Improving Robot Cell Efficiency Using ROBOGUIDE simulation - Patti Engineering
    Have you ever wanted to try some new ideas to improve your robot cell efficiency?  Many people think of testing robot arm paths when they think of ROBOGUIDE simulation software, but there are a number of other changes and ideas that can be virtually ...
    bit.ly
  • Patti Engineering, Inc. shared an update
    PostedWednesday, October 16,2019 at 1:20 PM
    While this change did have to occur while production was not running in order to replace the hardware, the update went rather smoothly with only a hardware config download and some minor testing.
    
    http://bit.ly/2ZMSWtK
    
    Retrofitting a Siemens ET 200x with ET 200pro - Patti Engineering
    Challenge As part of a retool, a customer was looking to upgrade their Siemens ET 200x field devices.  This legacy hardware was outdated to the point of searching eBay for replacement parts.   Solution The Siemens ET 200pro was specified as the repla ...
    bit.ly
View More
Latest Resources
  • PostedMonday, July 23,2018 at 10:42 AM

    A critical part of executing a successful UHF RFID project is ensuring adequate antenna coverage of the read point. Antenna coverage is best considered during the design phase of a project, when there are many options to ensure proper tag reads. Antenna coverage must be checked during the commissioning phase, which may uncover gaps in antenna coverage. If corrective action is required during commissioning, the RFID application engineer has some options to eliminate the deficiencies. The option selected depends on the specific application and the RFID application engineer’s professional judgment.

    Read More
  • PostedMonday, April 20,2015 at 2:00 PM

    Patti Engineering, a Mitsubishi Authorized Integrator with extensive expertise in Mitsubishi automation technology, worked with Kawasaki Robotics (USA), Inc. to upgrade a robotics underbody sealer system for the Toyota Camry’s paint line at Subaru of Indiana Automotive (SIA) in Lafayette, Indiana. See the case study for details.

    Read More
  • PostedFriday, April 17,2015 at 11:57 AM

    Siemens S5 to S7 Case Study. Knowing the S5s were discontinued years ago, Oetiker’s Production Engineer Jeremy Roberts and his team knew the older equipment with the S5 control system would become cumbersome in terms of cost and maintenance, with downtime potentially compromising production and adversely effecting Oetiker’s ability to service its customers’ needs in a timely fashion. Relying on Patti Engineering’s expertise in Siemens technology and control system upgrades, Oetiker’s team established a plan to upgrade their equipment’s legacy S5 control system to the more advanced and powerful Siemens S7.

    Read More